1. Remove cardboard carton from metal frame. 2. Remove scooter and parts provided for assembly from carton.Removal from CrateRT50
1013. Fill engine with correct amount of oil. Refer to owners manual for oil types and quantity.14. Fill gas tank as specied in owners manual. Fu
2Parts and HardwareZip ties BatteryFront WheelHeadlight PanelRear View MirrorsToolsHeadlight panel hardwareSteering column hardware
3Handlebar 3. Attach handlebar assembly to steering stem using hardware provided. Torque bolt to 33 ft.lbs. 4. Connect electrical compone
4Front wheel 5. Align speed sensor between front wheel and front fork. 7. Remove brake caliper shipping spacer and discard. Attach br
5Headlight Panel 9. Connect headlight wire. 10. Insert headlight panel to tabs on scooter and secure with 4mm phillip head screws.TabH
6Mirrors 11. Attach left and right mirrors to handlebars secure by tightening nut.Rear Mud Flap 12. Attach rear mud ap to rear
7Battery located in oorboard.Battery Installation WARNINGThe following procedure is very dangerous and should be performed with utmost care and atten
8Note: The following page is for vehicles with battery’s containing separate electrolyte pack. Most battery’s will come with the electrolyte already s
9 WARNINGNEVER REMOVE THE STRIP OF CAPS NOR ADD ANY WATER OR ELECTROLYTE.How to Initially Charge the battery:1. Connect the red positive (+) cable to
Comments to this Manuals